Road & Freeway Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km) studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection Supervision on constructing operation of Bonab-Mohammadyar -Naghadeh Supervision on operations for widening and constructing second band of Urumieh-Mahabad expressway lot 1 Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km) Supervision on constructing bridges of Jangal Abad and Sarjaz Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km) Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road View Count: 10 20 50 100 All Items Page 1 From 14 2 3 4 5 6 7 8 9 10 Next »