The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Studies on Southern part of Aprin-Shourab double-track railway Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km) Supervision on Southern part of Aprin-Mohammadiy double-track railway Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km) Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection Studies on the first and second phase of Zanjan main road to Factory zinc and Angooran mine (length about 12 km) Studies on the first and second phase of Zanjan-Zanjan Airport (length about 10 km) Studies on the first and second phase of Zanjan airport to Zanjan univercity and Zanjanrood (length about 5 km) Supervision on executive operation of Tabriz-Zanjan high way lot 12,13,14 Supervision on refinement operation of Khash-Zahedan lot 2 View Count: 10 20 50 100 All Items Page 1 From 3 2 3 Next » The 2000s Supervision on roadbed of Malayr-Hamedan railway lot 1,2,3 supervsion on road bed operation of Shiraz-Boushehr-Asalouyh railway lot 9,10,11 Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station Studies on the Shiraz-Boshehr-Asalouyh railway lot2 Supervision on Miyaneh-Bostanabaad-Tabriz railway lot6,7 Studies on the first and second phase of Chabahar -fahraj (lot6) railway Supervision on executive operation of Bafgh-Mashhad railway roadbed lot6,7 (length about 108.410 km) Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km) Supervision on executive operation of telecommiunication company digging Supervision on operations for widening and constructing second band of Urumieh-Mahabad expressway lot 1 View Count: 10 20 50 100 All Items Page 1 From 11 2 3 4 5 6 7 8 9 10 Next » The 2010s Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure) Studies and build of secend lane of Gazvin-Zanjan railway Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 ) Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road Supervision on constructing operation of Bonab-Mohammadyar -Naghadeh Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road Supervision on constructing bridges of Jangal Abad and Sarjaz Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services View Count: 10 20 50 100 All Items Page 1 From 4 2 3 4 Next »