The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Supervision on executive operation of Hokm abaad-Esfarayn Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km) Refine studies of Ferdous-Gonabad (length about 70 km) Supervision on executive operation of Bardeskan-Bajestan lot4 supervision on executive operation of Soltan abaad-Shafi abaad road lot1 supervision on executive operation of Kakshour bridge and Sabzevar-Bardescan road lot1A and 1B Supervision on executive operation of Sabzevar-Bardescan lot2 Supervision on refinement operation of Iranshahr-Sarbaz View Count: 10 20 50 100 All Items « Previous 1 2 Page 3 From 3 The 2000s Supervision on refinement operation and asphalt Overlay of main road and rural road of Firoozkooh Supervision on asphalt Overlay of Qom old road between Tehran - Hasanabaad studies on the first and second phase of Boomehen bridge widening on Boomehen blv studies on the first and second phase of Emam Ali highway road and Intersections Supervision on operations for widening Eshtehard road and asphalt overlay of Mahdasht-Eshtehard road Supervision on repairment and asphalt Overlay of ghochak pass-Lashkarak Sq-Oushan Supervision on repairment and asphalt overlay of Roodehen-Gilavand road and execution of Aminabad slow band and Ovzaneh pass Supervision on repairment and asphalt Overlay of Tehran-Qom freeway(west band of lot 1 and east band of lot 2 Refine studies (type D-A) on Nehbandan-Dehsalm Refine studies (type D-A) on Dooghaei-Soltanabaad-Sabzehvar View Count: 10 20 50 100 All Items « Previous 1 2 3 Page 4 From 11 5 6 7 8 9 10 Next » The 2010s Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure) Studies and build of secend lane of Gazvin-Zanjan railway Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 ) Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road Supervision on constructing operation of Bonab-Mohammadyar -Naghadeh Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road Supervision on constructing bridges of Jangal Abad and Sarjaz Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services View Count: 10 20 50 100 All Items Page 1 From 4 2 3 4 Next »