The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Supervision on executive operation of Hokm abaad-Esfarayn Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km) Refine studies of Ferdous-Gonabad (length about 70 km) Supervision on executive operation of Bardeskan-Bajestan lot4 supervision on executive operation of Soltan abaad-Shafi abaad road lot1 supervision on executive operation of Kakshour bridge and Sabzevar-Bardescan road lot1A and 1B Supervision on executive operation of Sabzevar-Bardescan lot2 Supervision on refinement operation of Iranshahr-Sarbaz View Count: 10 20 50 100 All Items « Previous 1 2 Page 3 From 3 The 2000s studies on the first and second phase of Zabol-Zahedan technical structure studies on the first and second phase of Zabol-Dostmohamad studies on the first and second phase of Talesiyah-Dashtak supervision on constracting of Zabol-Lotak 2nd band lot1 Refine studies on the main road to four lain high way of zabol-Zahedan supervion on amendment of accident prone locations of Zahedan-Mirjaveh and Mohamadabaad beltway Supervision on refinement operation (type B) of Zahedan-Sefidaabeh road lot A Studies on the first and second phase of Mohammadabad accident prone locations amendment Refine studies (type A) on Shourgaz-Zahedan road (length 210km) Preliminary studies of Zabol-Zahedan road Increase capacity View Count: 10 20 50 100 All Items « Previous 1 2 3 4 5 Page 6 From 11 7 8 9 10 Next » The 2010s Supervision on third part of executive operation of Emam Ali highway between north of Bakhtar messy to Matlabnejad Avenue Supervision on the constracting of Bam-zahedan-Mirjaveh second lane lot 3a supervision on constracting of Zabol-Zahedan 2nd band Between 8+500 to 28+112 Supervision on intersaction of Bojnoord southern ring road with Bojnoord-Beshghardash road(Beshghardash intersaction) Supervision on constructing rural roads of Esfarayn city Studies on the first and second phase of Bojnoord southern ring road Supervision on Maneh and Samalghan rural road Supervision on executive operation of kerik intersaction Supervision on 2nd part of the 3rd phase (workshop supervision)of preparation of lands for co-operatives housing of Mehrshirvan Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass- View Count: 10 20 50 100 All Items « Previous 1 Page 2 From 4 3 4 Next »