The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Supervision on executive operation of Hokm abaad-Esfarayn Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km) Refine studies of Ferdous-Gonabad (length about 70 km) Supervision on executive operation of Bardeskan-Bajestan lot4 supervision on executive operation of Soltan abaad-Shafi abaad road lot1 supervision on executive operation of Kakshour bridge and Sabzevar-Bardescan road lot1A and 1B Supervision on executive operation of Sabzevar-Bardescan lot2 Supervision on refinement operation of Iranshahr-Sarbaz View Count: 10 20 50 100 All Items « Previous 1 2 Page 3 From 3 The 2000s Supervision on asphalt Overlay of Chaman bid -Jajarm road supervion on amendment of accident prone locations of Chaman bid-Ghareseylab Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel Refine studies (type D-A) on Jajarm-Amirabaad Y intersection Supervision on executive operation of Jajarm-Sankhast main road(length about 40.730 km) Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass) Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km) Preliminary studies on Ghochan-Bam road Studies on securing Qouchan –Imamgholi road (Qouchan beltway) Supervision on executive operation of Ferdous-Gonabad View Count: 10 20 50 100 All Items « Previous 2 3 4 5 6 Page 7 From 11 8 9 10 11 Next » The 2010s Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure) Studies and build of secend lane of Gazvin-Zanjan railway Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 ) Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road Supervision on constructing operation of Bonab-Mohammadyar -Naghadeh Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road Supervision on constructing bridges of Jangal Abad and Sarjaz Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services View Count: 10 20 50 100 All Items Page 1 From 4 2 3 4 Next »