The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Supervision on executive operation of Hokm abaad-Esfarayn Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km) Refine studies of Ferdous-Gonabad (length about 70 km) Supervision on executive operation of Bardeskan-Bajestan lot4 supervision on executive operation of Soltan abaad-Shafi abaad road lot1 supervision on executive operation of Kakshour bridge and Sabzevar-Bardescan road lot1A and 1B Supervision on executive operation of Sabzevar-Bardescan lot2 Supervision on refinement operation of Iranshahr-Sarbaz View Count: 10 20 50 100 All Items « Previous 1 2 Page 3 From 3 The 2000s Supervision on asphalt Overlay of Chaman bid -Jajarm road supervion on amendment of accident prone locations of Chaman bid-Ghareseylab Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel Refine studies (type D-A) on Jajarm-Amirabaad Y intersection Supervision on executive operation of Jajarm-Sankhast main road(length about 40.730 km) Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass) Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km) Preliminary studies on Ghochan-Bam road Studies on securing Qouchan –Imamgholi road (Qouchan beltway) Supervision on executive operation of Ferdous-Gonabad View Count: 10 20 50 100 All Items « Previous 2 3 4 5 6 Page 7 From 11 8 9 10 11 Next » The 2010s Supervision on constructing rural roads of Ghochan city Supervision on executive operation of Namouriyan bridge and Iranshahr-Mehrestan asphalt overlay Supervision on constructing of Khash-Iranshahr 2th lane (lot4) Supervision on Refinement and asphalt Overlay of Jakigur-Chabahar road and The remaining operations of Rimdan bridge and asphalt overlay of Jakigur-Ghasreghand-Bent Supervision on Refinement and asphalt Overlay of Nikshahr-Chabahar and Iranshahr-Khash and Iranshahr-Bam road Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road studies on the first and second phase of Koorkalkaliha bridge Supervision on constructing of Kajoo bridge located on Jakigur-Nikshahr road Supervision on executive operations of constructing Depkoor –Firoozabad bidges and variant of Badkesh pass at Jakigvar-Chabahar road Supervision on 1- Supplementary Operations of Pishin bridge 2-constracting of Pishin vaeiants 3-refinement of Shirgovaz variant located on Jakigur-Chabahar View Count: 10 20 50 100 All Items « Previous 1 2 Page 3 From 4 4 Next »