The 1980s Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin supervision on roadbed of Qom 25tons Silo railway studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km) Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2 Studies on second phase of Mirjaveh ring road Supervision on executive operation of asphalt overlay Hsourgaz-Zahedan main road Supervision on constructing of Zahedan-Mirjaveh main road (lot 1,2,3,4,5) studies on second phase of mirjaveh main road to Pakistan border Supervision on refinement operation Bojnoord-Bardescan road Supervision on constructing of Mashhad-Neyshabour main road The 1990s Studies on Southern part of Aprin-Shourab double-track railway Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km) Supervision on Southern part of Aprin-Mohammadiy double-track railway Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km) Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection Studies on the first and second phase of Zanjan main road to Factory zinc and Angooran mine (length about 12 km) Studies on the first and second phase of Zanjan-Zanjan Airport (length about 10 km) Studies on the first and second phase of Zanjan airport to Zanjan univercity and Zanjanrood (length about 5 km) Supervision on executive operation of Tabriz-Zanjan high way lot 12,13,14 Supervision on refinement operation of Khash-Zahedan lot 2 View Count: 10 20 50 100 All Items Page 1 From 3 2 3 Next » The 2000s Studies on the first and second phase of Damen bridge Supervision on asphalt Overlay of Jakigur - Chabahar Supervision on constructing of Pishin bridge studies on the second phase of Gang bridge Supervision on asphalt Overlay of Jakigur-Chabahar from 24Km to 150Km Supervision on executive operation of Jakigur bridge Studies on the first and second phase of Jakigour bridge located on Iranshahr -Chabahar road Refine studies type D-A refinement and amendment of accident prone locations Jakigoor-Chabahar Refine studies (type A) on Chabahar-Konarak (length 55km) supervion on type D-A refinement and amendment of accident prone locations Jakigoor-Chabahar View Count: 10 20 50 100 All Items « Previous 2 3 4 5 6 7 8 9 Page 10 From 11 11 Next » The 2010s Supervision on third part of executive operation of Emam Ali highway between north of Bakhtar messy to Matlabnejad Avenue Supervision on the constracting of Bam-zahedan-Mirjaveh second lane lot 3a supervision on constracting of Zabol-Zahedan 2nd band Between 8+500 to 28+112 Supervision on intersaction of Bojnoord southern ring road with Bojnoord-Beshghardash road(Beshghardash intersaction) Supervision on constructing rural roads of Esfarayn city Studies on the first and second phase of Bojnoord southern ring road Supervision on Maneh and Samalghan rural road Supervision on executive operation of kerik intersaction Supervision on 2nd part of the 3rd phase (workshop supervision)of preparation of lands for co-operatives housing of Mehrshirvan Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass- View Count: 10 20 50 100 All Items « Previous 1 Page 2 From 4 3 4 Next »