English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km)
studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km)
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
View Count:
12
24
60
120
All Items
Page 1 From 7
2
3
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Refine studies (type C) on Zanjan Gas power plant access road to Zanjan-ghazvin highway
View Count:
8
16
40
80
All Items
« Previous
1
2
Page 3 From 11
4
5
6
7
8
9
10
Next »