English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km
Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km)
Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km)
Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Refine studies (type C) on Zanjan Gas power plant access road to Zanjan-ghazvin highway
View Count:
12
24
60
120
All Items
« Previous
1
Page 2 From 7
3
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2
Studies on second phase of Mirjaveh ring road
studies on second phase of mirjaveh main road to Pakistan border
Studies on the first and second phase of Bojnoord southern ring road
Studies on the first and second phase of securing accident prone locations of Kerik residential area
Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel
Refine studies (type D-A) on Jajarm-Amirabaad Y intersection
Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass)
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
Page 7 From 11
8
9
10
11
Next »