English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km
Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km)
Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km)
Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Refine studies (type C) on Zanjan Gas power plant access road to Zanjan-ghazvin highway
View Count:
12
24
60
120
All Items
« Previous
1
Page 2 From 7
3
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km)
Preliminary studies on Ghochan-Bam road
Studies on the first and second phase of Jajarm-Sankhast main road (length about 55 km)
Studies on second phase of Esfarayn-Sankhast road (length about 58 km)
Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass-
Studies on securing Qouchan –Imamgholi road (Qouchan beltway)
Compeleting of studies on Mashhad-Fariman road
Refine studies (type D-A) on the first and second phase of Torbat heydariyh-Mehne road
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
7
Page 8 From 11
9
10
11
Next »