Study Projects
Refine studies (type B-D) on the first and second phase of Zanjan-Bijar
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the first and second phase of Zanjan main road to Factory zinc and Angooran mine (length about 12 km)
Studies on the first and second phase of Abhar--Ghidar ring road (length about 10 km)
Studies on the first and second phase of Zanjan-Zanjan Airport (length about 10 km)
Studies on the first and second phase of Zanjan airport to Zanjan univercity and Zanjanrood (length about 5 km)
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
studies on the first and second phase of Boomehen bridge widening on Boomehen blv
studies on the first and second phase of Emam Ali highway road and Intersections
Refine studies (type D-A) on Nehbandan-Dehsalm
Refine studies (type D-A) on Dooghaei-Soltanabaad-Sabzehvar
studies on the 2nd band of Mirjaveh-Zahedan-Bam road (Zahedan beltway)
View Count:
12
24
60
120
All Items
« Previous
1
2
Page 3 From 7
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km)
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km
Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km)
Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km)
Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road
View Count:
8
16
40
80
All Items
« Previous
1
Page 2 From 11
3
4
5
6
7
8
9
10
Next »