English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Refine studies (type B-D) on the first and second phase of Zanjan-Bijar
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the first and second phase of Zanjan main road to Factory zinc and Angooran mine (length about 12 km)
Studies on the first and second phase of Abhar--Ghidar ring road (length about 10 km)
Studies on the first and second phase of Zanjan-Zanjan Airport (length about 10 km)
Studies on the first and second phase of Zanjan airport to Zanjan univercity and Zanjanrood (length about 5 km)
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
studies on the first and second phase of Boomehen bridge widening on Boomehen blv
studies on the first and second phase of Emam Ali highway road and Intersections
Refine studies (type D-A) on Nehbandan-Dehsalm
Refine studies (type D-A) on Dooghaei-Soltanabaad-Sabzehvar
studies on the 2nd band of Mirjaveh-Zahedan-Bam road (Zahedan beltway)
View Count:
12
24
60
120
All Items
« Previous
1
2
Page 3 From 7
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Refine studies (type C) on Zanjan Gas power plant access road to Zanjan-ghazvin highway
View Count:
8
16
40
80
All Items
« Previous
1
2
Page 3 From 11
4
5
6
7
8
9
10
Next »