English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
studies on the first and second phase of Zabol beltway
studies on the first and second phase of Danesh Y intercetion and bridge
Refine studies (type c) on Khash Cement factory and mine Connecting road (length about 45 km)
studies on the Zabol-Zahak four lane main road
studies on the eastern beltway of Zahedan city
studies on the first and second phase of Zabol-Zahedan technical structure
studies on the first and second phase of Zabol-Dostmohamad
studies on the first and second phase of Talesiyah-Dashtak
Refine studies on the main road to four lain high way of zabol-Zahedan
Studies on the first and second phase of Mohammadabad accident prone locations amendment
Refine studies (type A) on Shourgaz-Zahedan road (length 210km)
Preliminary studies of Zabol-Zahedan road Increase capacity
View Count:
12
24
60
120
All Items
« Previous
1
2
3
Page 4 From 7
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Refine studies (type D-A) of Jakigur-Chabahar road
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
7
8
9
10
Page 11 From 11