English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
studies on the first and second phase of Zabol beltway
studies on the first and second phase of Danesh Y intercetion and bridge
Refine studies (type c) on Khash Cement factory and mine Connecting road (length about 45 km)
studies on the Zabol-Zahak four lane main road
studies on the eastern beltway of Zahedan city
studies on the first and second phase of Zabol-Zahedan technical structure
studies on the first and second phase of Zabol-Dostmohamad
studies on the first and second phase of Talesiyah-Dashtak
Refine studies on the main road to four lain high way of zabol-Zahedan
Studies on the first and second phase of Mohammadabad accident prone locations amendment
Refine studies (type A) on Shourgaz-Zahedan road (length 210km)
Preliminary studies of Zabol-Zahedan road Increase capacity
View Count:
12
24
60
120
All Items
« Previous
1
2
3
Page 4 From 7
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km)
Preliminary studies on Ghochan-Bam road
Studies on the first and second phase of Jajarm-Sankhast main road (length about 55 km)
Studies on second phase of Esfarayn-Sankhast road (length about 58 km)
Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass-
Studies on securing Qouchan –Imamgholi road (Qouchan beltway)
Compeleting of studies on Mashhad-Fariman road
Refine studies (type D-A) on the first and second phase of Torbat heydariyh-Mehne road
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
7
Page 8 From 11
9
10
11
Next »