English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass-
Studies on securing Qouchan –Imamgholi road (Qouchan beltway)
Compeleting of studies on Mashhad-Fariman road
Refine studies (type D-A) on the first and second phase of Torbat heydariyh-Mehne road
Studies on the first and second phase of Neyshaboor-Mashhad-_Torbat heydariyh intersection (baghche intersection
Studies on the first and second phase of constructing Mashhad -Fariman 2nd band
Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km)
Refine studies of Ferdous-Gonabad (length about 70 km)
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
studies on the first and second phase of Koorkalkaliha bridge
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
Studies on the first and second phase of Malouran bridge located on Nikshahr-Bent road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
Page 6 From 7
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km)
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km
Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km)
Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km)
Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road
View Count:
8
16
40
80
All Items
« Previous
1
Page 2 From 11
3
4
5
6
7
8
9
10
Next »