English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass-
Studies on securing Qouchan –Imamgholi road (Qouchan beltway)
Compeleting of studies on Mashhad-Fariman road
Refine studies (type D-A) on the first and second phase of Torbat heydariyh-Mehne road
Studies on the first and second phase of Neyshaboor-Mashhad-_Torbat heydariyh intersection (baghche intersection
Studies on the first and second phase of constructing Mashhad -Fariman 2nd band
Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km)
Refine studies of Ferdous-Gonabad (length about 70 km)
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
studies on the first and second phase of Koorkalkaliha bridge
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
Studies on the first and second phase of Malouran bridge located on Nikshahr-Bent road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
Page 6 From 7
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Refine studies (type B-D) on the first and second phase of Zanjan-Bijar
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the first and second phase of Zanjan main road to Factory zinc and Angooran mine (length about 12 km)
Studies on the first and second phase of Abhar--Ghidar ring road (length about 10 km)
Studies on the first and second phase of Zanjan-Zanjan Airport (length about 10 km)
Studies on the first and second phase of Zanjan airport to Zanjan univercity and Zanjanrood (length about 5 km)
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
studies on the first and second phase of Boomehen bridge widening on Boomehen blv
View Count:
8
16
40
80
All Items
« Previous
1
2
3
Page 4 From 11
5
6
7
8
9
10
Next »