English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass-
Studies on securing Qouchan –Imamgholi road (Qouchan beltway)
Compeleting of studies on Mashhad-Fariman road
Refine studies (type D-A) on the first and second phase of Torbat heydariyh-Mehne road
Studies on the first and second phase of Neyshaboor-Mashhad-_Torbat heydariyh intersection (baghche intersection
Studies on the first and second phase of constructing Mashhad -Fariman 2nd band
Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km)
Refine studies of Ferdous-Gonabad (length about 70 km)
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
studies on the first and second phase of Koorkalkaliha bridge
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
Studies on the first and second phase of Malouran bridge located on Nikshahr-Bent road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
Page 6 From 7
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2
Studies on second phase of Mirjaveh ring road
studies on second phase of mirjaveh main road to Pakistan border
Studies on the first and second phase of Bojnoord southern ring road
Studies on the first and second phase of securing accident prone locations of Kerik residential area
Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel
Refine studies (type D-A) on Jajarm-Amirabaad Y intersection
Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass)
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
Page 7 From 11
8
9
10
11
Next »