English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on the first and second phase of constracting Iranshahr ring road and Iranshahr intersections
Refine studies of Jakigur-Gasreghand-Nikshahr
Studies on the first and second phase of Rimdan bridge
Studies on the first and second phase of Damen bridge
studies on the second phase of Gang bridge
Studies on the first and second phase of Jakigour bridge located on Iranshahr -Chabahar road
Refine studies type D-A refinement and amendment of accident prone locations Jakigoor-Chabahar
Refine studies (type A) on Chabahar-Konarak (length 55km)
Refine studies (type D-A) of Jakigur-Chabahar road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
6
Page 7 From 7
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km)
View Count:
8
16
40
80
All Items
Page 1 From 11
2
3
4
5
6
7
8
9
10
Next »