English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on the first and second phase of constracting Iranshahr ring road and Iranshahr intersections
Refine studies of Jakigur-Gasreghand-Nikshahr
Studies on the first and second phase of Rimdan bridge
Studies on the first and second phase of Damen bridge
studies on the second phase of Gang bridge
Studies on the first and second phase of Jakigour bridge located on Iranshahr -Chabahar road
Refine studies type D-A refinement and amendment of accident prone locations Jakigoor-Chabahar
Refine studies (type A) on Chabahar-Konarak (length 55km)
Refine studies (type D-A) of Jakigur-Chabahar road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
6
Page 7 From 7
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
studies on the eastern beltway of Zahedan city
studies on the first and second phase of Zabol-Zahedan technical structure
studies on the first and second phase of Zabol-Dostmohamad
studies on the first and second phase of Talesiyah-Dashtak
Refine studies on the main road to four lain high way of zabol-Zahedan
Studies on the first and second phase of Mohammadabad accident prone locations amendment
Refine studies (type A) on Shourgaz-Zahedan road (length 210km)
Preliminary studies of Zabol-Zahedan road Increase capacity
View Count:
8
16
40
80
All Items
« Previous
1
2
3
4
5
Page 6 From 11
7
8
9
10
Next »