Activity
»
Projects
»
Projects By Activity Field
Road & Free way
Supervision on refinement operation and asphalt Overlay of Malard-Shahriyar road
Supervision on refinement operation and asphalt Overlay of main road and rural road of Firoozkooh
Supervision on asphalt Overlay of Qom old road between Tehran - Hasanabaad
studies on the first and second phase of Boomehen bridge widening on Boomehen blv
studies on the first and second phase of Emam Ali highway road and Intersections
Supervision on operations for widening Eshtehard road and asphalt overlay of Mahdasht-Eshtehard road
Supervision on repairment and asphalt Overlay of ghochak pass-Lashkarak Sq-Oushan
Supervision on repairment and asphalt overlay of Roodehen-Gilavand road and execution of Aminabad slow band and Ovzaneh pass
Supervision on repairment and asphalt Overlay of Tehran-Qom freeway(west band of lot 1 and east band of lot 2
Refine studies (type D-A) on Nehbandan-Dehsalm
Refine studies (type D-A) on Dooghaei-Soltanabaad-Sabzehvar
Supervision on executive operation of lot3 Ladiz-Sangan road
View Count:
12
24
60
120
All Items
« Previous
1
2
Page 3 From 11
4
5
6
7
8
9
10
Next »
Bridge & Intersection
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Supervision on executive operation of Bozineh rodoshour chay bridge located on Zarin abaad-Garmab road
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
Supervision on the constracting of Danesh Y intercection bridge
studies on the first and second phase of Danesh Y intercetion and bridge
Supervision on executive operation of kerik intersaction
Supervision on executive operation of Esfarayn-Sankhast road
View Count:
15
30
75
150
All Items
Page 1 From 2
2
« Previous
Next »
Railway
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies on Southern part of Aprin-Shourab double-track railway
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Supervision on roadbed of Malayr-Hamedan railway lot 1,2,3
supervsion on road bed operation of Shiraz-Boushehr-Asalouyh railway lot 9,10,11
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Supervision on Miyaneh-Bostanabaad-Tabriz railway lot6,7
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Supervision on executive operation of Bafgh-Mashhad railway roadbed lot6,7 (length about 108.410 km)
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Supervision on Southern part of Aprin-Mohammadiy double-track railway
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
supervision on roadbed of Qom 25tons Silo railway