English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects By Activity Field
Road & Free way
Refine studies (type D-A) on Jajarm-Amirabaad Y intersection
Supervision on executive operation of Jajarm-Sankhast main road(length about 40.730 km)
Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass)
Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km)
Preliminary studies on Ghochan-Bam road
Studies on the first and second phase of Jajarm-Sankhast main road (length about 55 km)
Supervision on executive operation Esfarayn-Bam road
Studies on second phase of Esfarayn-Sankhast road (length about 58 km)
Supervision on executive operation of Shafi abaad-Jajarm road
Supervision on asphalt overlay operation of Bojnourd-Minoodasht-Badranloo pass lot 2,3
Supervision on executive operation of Hokm abaad-Esfarayn
Supervision on refinement operation Bojnoord-Bardescan road
View Count:
12
24
60
120
All Items
« Previous
2
3
4
5
6
Page 7 From 11
8
9
10
11
Next »
Bridge & Intersection
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Supervision on executive operation of Bozineh rodoshour chay bridge located on Zarin abaad-Garmab road
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
Supervision on the constracting of Danesh Y intercection bridge
studies on the first and second phase of Danesh Y intercetion and bridge
Supervision on executive operation of kerik intersaction
Supervision on executive operation of Esfarayn-Sankhast road
View Count:
15
30
75
150
All Items
Page 1 From 2
2
« Previous
Next »
Railway
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies on Southern part of Aprin-Shourab double-track railway
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Supervision on roadbed of Malayr-Hamedan railway lot 1,2,3
supervsion on road bed operation of Shiraz-Boushehr-Asalouyh railway lot 9,10,11
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Supervision on Miyaneh-Bostanabaad-Tabriz railway lot6,7
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Supervision on executive operation of Bafgh-Mashhad railway roadbed lot6,7 (length about 108.410 km)
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Supervision on Southern part of Aprin-Mohammadiy double-track railway
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
supervision on roadbed of Qom 25tons Silo railway