English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects By Activity Field
Road & Free way
Supervision on executive operation of 2nd band of Fariman-Sang bast road
Studies on the first and second phase of Neyshaboor-Mashhad-_Torbat heydariyh intersection (baghche intersection
Studies on the first and second phase of constructing Mashhad -Fariman 2nd band
Supervision on refinement of Ferdous-Gonabad
Supervision on reconstructing 2nd band of Baghche-Neyshaboor
Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km)
Refine studies of Ferdous-Gonabad (length about 70 km)
Supervision on executive operation of Bardeskan-Bajestan lot4
supervision on executive operation of Soltan abaad-Shafi abaad road lot1
supervision on executive operation of Kakshour bridge and Sabzevar-Bardescan road lot1A and 1B
Supervision on executive operation of Sabzevar-Bardescan lot2
Supervision on constructing of Mashhad-Neyshabour main road
View Count:
12
24
60
120
All Items
« Previous
2
3
4
5
6
7
8
Page 9 From 11
10
11
Next »
Bridge & Intersection
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Supervision on executive operation of Bozineh rodoshour chay bridge located on Zarin abaad-Garmab road
Studies of shour chay bridge located on Zarin abaad-Garmab
Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services
Supervision on the constracting of Danesh Y intercection bridge
studies on the first and second phase of Danesh Y intercetion and bridge
Supervision on executive operation of kerik intersaction
Supervision on executive operation of Esfarayn-Sankhast road
View Count:
15
30
75
150
All Items
Page 1 From 2
2
« Previous
Next »
Railway
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies on Southern part of Aprin-Shourab double-track railway
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Supervision on roadbed of Malayr-Hamedan railway lot 1,2,3
supervsion on road bed operation of Shiraz-Boushehr-Asalouyh railway lot 9,10,11
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Supervision on Miyaneh-Bostanabaad-Tabriz railway lot6,7
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Supervision on executive operation of Bafgh-Mashhad railway roadbed lot6,7 (length about 108.410 km)
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Supervision on Southern part of Aprin-Mohammadiy double-track railway
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
supervision on roadbed of Qom 25tons Silo railway